Advantage:
- Experienced QC team and inspectors dedicated to energy storage projects
- In-house enclosure and plastic injection molding support for complete system assembly
- High-precision electrical testing including ICT, functional test, X-ray inspection, and burn-in test
- 2 dedicated hand soldering lines with capacity up to 0.5 million points per day
- 2 conformal coating production lines for corrosion and moisture protection
- Full compliance with UL, ISO 9001, ISO 13485, ISO 14001, IATF 16949, RoHS, and REACH standards
Our Capabilities for Energy Storage PCBA:
PCB layers: 2–20 layers, supporting FR4, high-TG FR4, and heavy copper options for high-current circuits
Component range: 01005 to large power connectors, including MOSFETs, capacitors, and protection ICs
Surface finishes: ENIG, immersion tin, HASL lead-free, and hard gold plating for long-term reliability
Board thickness: 0.4–6.0mm, with support for high-power thermal management designs
Quality & Lead Time:
Standard order lead time: 7–15 working days after material readiness
Quick-turn prototype service: available in 3–5 working days for urgent projects
Full batch traceability and quality documentation provided for every order
Manufacturing Capacity
16 SMT production lines --20million points/day
2 THT production lines----2million points /day
2 Hand soldering lines -----0.50 million points/day
4 testing lines
3 Final assembly lines -----15000pcs/day
1 Burn in room --------------10000PCS/day
2 conformal coating production lines
BQC Certification



FAQ
Q1: Can you provide customized energy storage PCBA assembly services?
A: Yes. We offer one-stop services including design review, component sourcing, SMT assembly, functional testing, and environmental aging to meet your specific energy storage system requirements.
Q2: What certifications do you have for energy storage PCBA production?
A: We hold ISO 9001, ISO 13485, ISO 14001, and IATF 16949 certifications, and comply with UL, RoHS, and REACH standards for industrial energy storage products.
Q3: Do you support small-batch energy storage PCBA orders?
A: Yes. We handle both low-volume prototypes (50–500 units) and high-volume production runs, with flexible scheduling to match your project timeline.
Q4: How do you ensure the reliability of energy storage PCBA?
A: We use industrial-grade materials, perform high-precision electrical testing, conformal coating, and environmental aging tests to verify performance under harsh operating conditions.
Q5: What is the lead time for energy storage PCBA orders?
A: For standard orders, the lead time is 7–15 working days. We also support quick-turn prototype service in 3–5 working days for urgent projects.
Hot Tags: Industrial Energy Storage PCBA Assembly Service, China, manufacturers, factory, customized, laser cutting, retail display manufacturing, leather goods manufacturing, household appliances manufacturing, riveting services, woodworking services









